Optimization of operating costs when using a prefabricated foundation for wind turbines
Abstract
Optimization of operating costs when using a prefabricated foundation for wind turbines
Incoming article date: 15.02.2023The optimization of the taxable base of capital construction objects is considered, this is the desire of customers and operating organizations to manage the cost of ownership of one or another technical solution, which is certainly reasonable in modern conditions, when when making a technical solution, its full cost is estimated, including the so-called cost of ownership for the entire period of the life cycle of the object, from the formation of an idea for the creation of a future object to its decommissioning.
Keywords: collapsible foundation, protective element, flow method, wind power plant, building structures