×

You are using an outdated browser Internet Explorer. It does not support some functions of the site.

Recommend that you install one of the following browsers: Firefox, Opera or Chrome.

Contacts:

+7 961 270-60-01
ivdon3@bk.ru

Mathematical modeling of stress-strain state of the Kuznetsovsky tunnel under reconstruction

Abstract

Mathematical modeling of stress-strain state of the Kuznetsovsky tunnel under reconstruction

Zakavova A.A., Manko A.V.

Incoming article date: 02.04.2024

The large-scale development of Russia's lands led to the creation of a railroad network. Along with the laying of the railroad, the entire transportation infrastructure, such as bridges, tunnels and overpasses, was erected. Many structures are already more than 100 years old. The structures are deteriorating and approaching the end of their life cycle. It is therefore necessary to reconstruct or dismantle these structures. Due to the increased freight traffic between China, Russia and Western Europe, it is necessary to reconstruct all tunnels on the BAM. This paper presents one of the tunnel reconstruction options and investigates by mathematical modeling the stress-strain state of the system "array-construction" by which the tunnel can be reconstructed.

Keywords: mathematical modeling, stress-strain state, railway tunnel, reconstruction, finite element method, drilling and blasting, mechanized tunneling, mining machine, displacements, Baikal-Amur Mainline