Establishment of the capacity to remove soil horizons in the creation of capital construction projects through engineering and soil surveys

Abstract

Establishment of the capacity to remove soil horizons in the creation of capital construction projects through engineering and soil surveys

" Dobrinsky D.R, Tikhonova M.M, Lavrentieva L.M, Azarov A.V."

Incoming article date: 31.10.2017

In accordance with the requirements of the legislation of the Russian Federation on the basis of a complex of pros-pecting works, it is necessary to establish the rate of removal of the soil layer. The thickness of the removal of the soil layer is established on the basis of a complex of laboratory studies of soil samples taken from established soil hori-zons. The thickness of the soil horizons is currently determined using stock data based on the characteristic type of soil. However, the thickness of soil horizons in a number of cases on sections characterized by identical soil characteris-tics differ. Thus, in each specific case it is necessary to link the soil sections and boundaries of the selected soil con-tours instrumentally through ecological excavations. High saturation with soil workings can lead to a significant distur-bance of the soil cover of the surveyed area. To solve the above problem, it is proposed to use a unit for studying the power of multicomponent dynamical systems for vertical drilling of soil wells

Keywords: soil horizon, fertile layer, survey, withdrawal power, prospecting, well, drilling, capital construction, photographic fixation, deposition