Covers the relevant issues of reduction of construction period by using prefabricated structures. The proposed method is confirmed by calculations proving its reliability and feasibility. When developing the method was considered economic component of the design and construction of industrial complexes
Keywords: organization of construction; modular construction, industrial construction