This article examines the existing methods of organizing construction production, such as: sequential, parallel, flow, and flow-operational, flow-dismembered and flow-complex methods. The features of their formation and differences in the parameters of the duration of construction and the use of resources are determined. Considered and analyzed one of the key and main processes in the organization and planning of construction - the formation of flows. Methods for determining the sequence of construction of complexes of buildings and structures and methods for their optimization, which are aimed at achieving the final result - putting into operation a complex of objects with the required quality and on time, are investigated. As a result, it was concluded that the decisions and methods adopted in the process of developing organizational and technological solutions should ensure the continuity of construction production, competent management of all resources, correct interconnection of all types of work and their execution on time.
Keywords: organizational and technological solutions; integrated construction; сonstruction production; planning; work organization methods; complex flows; construction duration