×

You are using an outdated browser Internet Explorer. It does not support some functions of the site.

Recommend that you install one of the following browsers: Firefox, Opera or Chrome.

Contacts:

+7 961 270-60-01
ivdon3@bk.ru

  • Technical expertise: Identification of hazardous production facilities

    Issues of carrying out the identification of hazardous production facilities are discussed. On a real example of a survey of a warehouse of combustible substances, the implementation of a technical expertise with a conclusion drawn up on its results is illustrated. The article was written on the basis of the completed research work No. 22-78.

    Keywords: hazardous production facility, identification, technical expertise, industrial safety, building structures

  • Conservation of fuel oil facilities: project development technology

    The method of drawing up a project for the conservation of fuel oil facilities related to hazardous production facilities (HIF) is discussed. An algorithm for the development of a real project for the conservation of structures equipped with technical devices, which are hazardous production facilities in the field of operation of explosive and chemically hazardous production facilities, is given. The article was written on the basis of the completed research work No. 21-216.

    Keywords: oil production, conservation project, industrial safety expertise, buildings and structures, technical devices, building structures

  • Some aspects of the technology of conducting the restoration of the facade on a newly discovered object of cultural heritage

    An algorithm is given for carrying out repair work in rooms where devices with ionizing radiation sources are located (inspection points, X-ray machines, computed tomography devices, mammographs, etc.). All stages of the work are considered: the development of documentation, the conduct of examinations, the implementation of construction and installation works, the commissioning of the object (apparatus). Practical recommendations are given on the preparation of the required design and estimate documentation and repair work. The article was written on the basis of completed research work No. 20-147.

    Keywords: construction and installation works, repairs, buildings and structures, ionizing radiation sources, X-ray machines, computed tomography devices, expertise