The problem of functioning of difficult innovative enterprise elaborative modern наукоемкие technologies and wares is in-process considered, therefore the questions related to the priv at all levels of work of such enterprise are very actual and important. The most essential links and control parameters are distinguished, his periodicity is regulated. From the mathematical point of view a problem is taken to the decision of the optimization task put as a task of optimal allocation of resources with the scalar or vectorial criterion of optimization. A few approaches (methods and algorithms) of decision of this task are offered. Using the offered methodology, it is possible to conduct verification of work of enterprise from the point of view of providing of informative safety in acceptable time and with acceptable
Keywords: control parameters, scalar, vectorial criterion, testing, optimization