The loads on the power floors and column foundations of modern logistics centers can reach 6-9 t/m2 and 1000 t, respectively. At the same time, the step of the grid of exploration wells in the mined areas does not allow reflecting on the geological sections the exact geometry of the occurrence of weak, untreated soils of backfilling pits. The use of a method for strengthening man-made soils by pressing in prefabricated prismatic piles made it possible to compensate for the missing information from engineering and geological surveys by controlling the forces of indentation and thus determining the occurrence marks of more durable foundation soils.
Keywords: engineering and geological surveys, the territory being worked on, man-made soils, soil reinforcement with piles, geological section
The paper considers the problem of the arrangement of the abutments of newly erected driveways and roads of agricultural production enterprises to existing roads and driveways. When connecting the "pies" of the roadways of the projected driveways with the existing landscaping, it is necessary to solve the problem of preventing cracking in the coating at the places of the thickness difference of the structural layers. In the article, this problem is solved both from the technical side, by ensuring the joint work of the new and existing road structure, and from the normative one by assigning the projected passage to the IVB category road, in accordance with SP 37.13330.2012, which allows the construction of a road with curbs without curbs and, as a consequence, without storm sewers and sewage treatment plants.
Keywords: road network, cadastral boundaries, the design of the widening of the passage, the technical solution of the junction of roads, transverse profile